Case Studies

curve-down
Displaying 190 - 196 of 224
ZA flag

Case Studies

AESSEAL water management systems cutting water usage at the plant by more than 60,000 kilolitres per month.

GB flag

Case Studies

One of the largest Bioethanol production plants in Europe was having a failure every 2 months on a group of pumps in the distillation area of the plant, costing over £75,000 per outage.

US flag

Case Studies

A paper mill in Maine, USA was having issues with water and stock getting into their Hydropulper gearbox.

GB flag

Case Studies

A chemical plant was installing a new conveyor system and the onsite engineer had concerns over the OEM sealing options for the plummer block bearings.

AU flag

Case Studies

A coal mine in Australia was using gland packing on 3 coal slurry transfer pumps.

GB flag

Case Studies

A UK based Oil Refinery was having repeated failures on a Coppus 24 Steam Turbine.

PL flag

Case Studies

A brown coal mine in Poland had lip seals fitted on their intermediate shaft bearing housings.