Excessive vibrations in a vertical pump in a slurry pit application was leading to failure every month for the North Carolina company Befesa

US flag

Case Studies

A US mining company was concerned that its large end suction pumps  were using excessive amounts of water.

CURC the best option for US textile firm
US flag

Case Studies

Long lead times in procuring replacement parts for a large non-standard component seal were causing production delays for a US textile company.

TR flag

Case Studies

A Turkish phosphate fertiliser was established following a requirement for Turkey to produce most its own phosphate fertiliser.

US flag

Case Studies

A New England pulp and paper company was reporting the persistent failure of its single seals,

US flag

Case Studies

A corn wet milling plant in the USA had a problem with leaking seals on the centrifugal pumps.

GB flag

Case Studies

The seal on a pump at a chemical plant in the east of England was burning out on average every two weeks due to dry running, resulting in some four hours of downtime each time it failed.