API Piping Plans

curve-down
本部分阐述的 API 计划由 API 682 第 3 版和 API 610 第 10 版定义。这些是业内广泛采用的标准冲洗管道布置。客户可根据需要采用不同的计划。 欲了解更多详情,请联系 AESSEAL 系统部。 电话:+44 (0)28 9266 9966 邮箱:systems@aesseal.com

An external fluid stream is brought to atmospheric side of the seal faces using quench and drain connections.

Leakage from seal faces is directed to a liquid collection system. A vessel with a high level alarm is provided for detection of excess leakage.

Leakage from seal faces is directed to a liquid collection system. A vessel with a high level alarm is provided for detection of cumulative leakage.

Throttle bushing in seal gland restricts seal leakage in event of seal failure. Pressure increase is detected by a pressure transmitter.

Orifice plugs in drain port restricts seal leakage in event of seal failure. Pressure increase detected by pressure transmitter.

Plugged connections for future provision to supply a buffer gas to a dual containment seal.

Buffer gas is passed through the containment seal chamber to sweep inner seal leakage away from outer seal to a collection system and / or dilute the leakage.

关注我们