Food and beverage - USA2

USA

"A double seal failed on a critical Chemineer reactor application. The OEM quoted an unacceptable 8-10-day delivery for a new seal. AESSEAL reacted, repaired the seal and installed it within 3 days, minimising the cost of lost production."